3 installation steps of CNC turning center
The CNC turning center is used for the cnc machining of various types of sheet metal parts, and can automatically complete a variety of complex hole shapes and shallow drawing machining at one time. How to install CNC turning center? The method is as follows:
1.Lifting and transportation
The lifting and positioning of the CNC turning center should use the special lifting tools provided by the manufacturer, and other methods are not allowed. No special lifting tools are needed, and wire ropes should be used for lifting and positioning in accordance with the instructions.
2.Foundation and location
The CNC turning center should be installed on a solid foundation, and the position should be away from the vibration source; avoid sunlight and heat radiation; place in a dry place to avoid the influence of humidity and airflow. If there is a vibration source near the CNC turning center, anti-vibration grooves must be set around the foundation.
3.Installation of machine tools
The CNC turning center is placed on the foundation and should be leveled in a free state, and then the anchor bolts should be evenly tightened. For ordinary machine tools, the level reading does not exceed 0.04 / 1000mm. For high-precision machine tools, the level reading exceeds 0.02 / 1000mm. When measuring the installation accuracy, it should be performed at a constant temperature, and the measurement tool needs to be used for a certain period of time. When installing the machine tool, make every effort to avoid the installation method that causes the machine tool to have forced deformation. During the installation of the CNC turning center, some parts of the machine tool should not be removed casually. The removal of the parts may cause an important new distribution of the internal stress of the machine tool, thereby affecting the accuracy of the machine tool.
4.Lifting and transportation
The lifting and positioning of the CNC turning center should use the special lifting tools provided by the manufacturer, and other methods are not allowed. No special lifting tools are needed, and wire ropes should be used for lifting and positioning in accordance with the instructions.
5.Installation of machine tools
The CNC turning center is placed on the foundation and should be leveled in a free state, and then the anchor bolts should be evenly tightened. For ordinary machine tools, the level reading does not exceed 0.04 / 1000mm. For high-precision machine tools, the level reading exceeds 0.02 / 1000mm. When measuring the installation accuracy, it should be performed at a constant temperature, and the measurement tool needs to be used for a certain period of time. When installing the machine tool, make every effort to avoid the installation method that causes the machine tool to have forced deformation. During the installation of the CNC turning center, some parts of the machine tool should not be removed casually. The removal of the parts may cause an important new distribution of the internal stress of the machine tool, thereby affecting the accuracy of the machine tool.